Lead with your own data

Know your number before you start

Join turns your own completed projects into a conceptual estimate in minutes. It's a private sandbox where you shape a new build from what your projects actually cost, build cost confidence as the design evolves, and meet your GC already knowing where the market should land.

On-demand webinar

The owner and GC playbook, straight from the source.

Watch now
10,000+
projects on Join
$500B+
in project value
Trusted by owners
OhioHealth logo
LCOR logo
Life Time logo
Baptist Health logo
We have dozens of similar projects across our system, and Join finally gives us a way to use that history. If someone says, ‘We need a 36-bed med-surg unit,’ I can instantly pull up three comparable projects, adjust the square footage and dates, and produce a reliable estimate in minutes. That’s the beauty of Join — it turns our past work into actionable data.
Major southeast healthcare system
Anonymous owner testimonial
Your own cost sandbox

Your most reliable cost data is your own

Most owners don't get a real cost picture until late in the process, when the options have already narrowed. Benchmarking flips that: pull your own history and know what a project should cost from the very start, while the design can still change.

A defensible number in minutes

Pull your comparable projects, adjust for market and timing, and build a directional budget in minutes, so you can see whether a project pencils out before you commit.

Shape it in your sandbox

Evaluate different packages, compare incoming GC bids against historicals, and hold contingency where you want it, all before anything is locked in.

Come to the table informed

Walk into design and GC conversations already knowing where the market should land, and weigh incoming estimates against a number grounded in your own history.

See how it works

From your own history to a confident number

1Benchmarking

Sketch a new build from projects you've already done

Pull your comparable completed projects side by side and let their real costs shape a conceptual estimate, in minutes.

Join benchmarking view comparing categorized cost per GSF across completed projects
Your completed projects, compared
2Scenarios

Model your options in a space that's yours

Hold alternates, allowances, and GC bids in your own scenarios, separate from the live project, and run “what-if” comparisons that balance cost, design, and end-user value, without rework or duplicate estimates.

Join scenarios view comparing lower, mid, and higher cost options
Your own space, apart from the project
In their words

From boardroom doubt to "sign it today"

[Our new CEO wouldn't sign a $200M contract without proof there was no cost exposure left.] I said, "Give me 30 seconds," and showed her how we've achieved cost certainty and beyond. Twenty minutes in, she said, "I'm blown away. I'm done. We're signing this today."
AZ
Aaron Zeligman
Senior Project Executive, Banner Health

“That gives me the ability to create a directional budget in seconds.”

OhioHealth logo
Evan Machado
Senior Project Manager, OhioHealth

“If we’re far higher or lower than the benchmark, it’s an alarm. We go and do more scrutiny.”

Roche logo
Sima Rokni
Principal Project Controls Manager, Roche

“We're able to generate an estimate in 10-15 minutes, when before it would have been a couple hours.”

Life Time logo
Gavin Riebe
Preconstruction Engineer, Life Time
$340M
Held to target
budget

Michigan State University · Engineering & Digital Innovation Center

“Being able to track cost and potential budget impacts related to design decisions greatly enhances my ability to present information to my stakeholders. This allows for real-time, efficient decision-making. I find Join invaluable.”
Jeff Bonk · Project Delivery Manager, Michigan State University
Read the case study
How teams put Join Benchmarking to work

The engine runs on your own data and gets sharper with every build

Benchmarking isn't an industry average handed to you. It's your own history, working for you. Here's what that depth looks like in practice.

Parkway

Parkway Construction & Architecture · National design-build firm · ENR Top 400 (#219)

Preconstruction Perspective
1,500+
of their own completed projects, benchmarked

A proprietary cost library that gets sharper with every build — not a generic industry index.

Before Join, one VP spent three weeks recreating a single estimate from scratch because the cost history lived in spreadsheets and people's heads. With Benchmarking, that history is instantly searchable.

With Join Benchmarking, we can repurpose company expertise — data, best practices, standards, lessons learned — in a way that's visible and valuable.
Jake Bloom
Preconstruction Manager, Parkway Construction & Architecture
Read the Parkway case study

Ready to lead with your own data?

Talk to our team about bringing Join to your next project.

Contact us